Wire Rope System 9010

Composite basic form. Under the number 9010  several basic forms above are connected with a crossways line coming through on both sides ("pi" form). A lower connection is not planned here. With such arrangement one or several wall openings can be framed, besides, it is unimportant how many fields are connected. The classification as a 'cable system' should serve to give an exemplary construction manual for such orders.

Information and assembly tips (order as kit not possible)

0.00 €0.00 €0.00 €0.00 €0.00 €



Dimensions: Usually it deals with longer areas of a ground floor with only a narrow wall stripe over the windows. The order of the cables between windows etc. is so carried out according to the scheduled planting of these fields as single "basic forms" and are treated in accordance with the overview. The distance between the cables, the number of inter-supports etc. have to be planned according to this. Use system 9010 if the planned upper horizontal cable doesn't jut out on the left and on the right, no matter how far. If longer horizontal rope sections of over 1.5 m result, intermediate holders are to be set, like here exemplary from left the 3rd and 7th critical point in the horizontal row. Same is valid for the perpendicular cable, then if necessary further cable bridges should be planned.  If the horizontal cable is to lock however concisely with the last perpendicular ropes, find a suitable building instruction under basic form 9020. If a lower connection is planned, you can find  information under 9030.


Required Parts: You yourself can put easy, middle, heavy, and solid kits together. Easy kits are possible, but troublesome at the fairlead and at arrangement of the cable terminals. Please use the notes at : Climbing Plants, and if necessary for choosing the choice of the kit. Depending on the arrangement, what’s needed is :

  • cable/wire 1.8 or 3 or 4 mm

  • cross holder (and plug)

  • (free drifting) cross terminal

  • end sleeves

  • if necessary tools and tying /binding materials


Installation: carried out as shown on the graphs, please also refer to the installation tips (see above). The process is transferable to similar and different arrangements. Basically, all exterior and long cable sections are first laid, then the shorter and more located in the interior.

Cable system for greenery
Greening of a wall
Greening of a finished concrete wall with an evergreen honeysuckle and others, cross support "Eco" WH 08111
Medium style for vine at a house in the Brittany/France
Climbing rose "Gloria de Dijon" on wire rope systems
Massive kit, rose "Gloria de Dijon"
Climbing roses
Wire rope system of the photo above, 1 year later, winter photo
Light / Medium / Heavy / Massive kit